42-18 201 STREET, Queens, NY, 11361
No reviews yet. Be the first to review this building!
Violations by Unit
(2 units)§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT EAST WALL IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 2nd CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st DOOR FROM NORTH AT EAST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQFT AT NORTH WALL, SOUTH WALL, EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES AND MAKE FLOORS SMOOTH AND CLEANABLE, IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: 5G
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Building Details
- Building Class
- C1
- Land Use
- 2
- Residential Units
- 54
- BBL
- 4062580016