Violations · 12
DateClassDescriptionStatus
4/10/2025Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B LOWER LEVEL, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION DISMISSED
4/10/2025Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B UPPER LEVEL, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION DISMISSED
7/11/2023Class B§ 27-2005 HMC: REFIT UPPER AND LOWER SASH OF EAST 1 WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION DISMISSED
6/6/2023Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALLABOVE THE WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH · Apt 5AVIOLATION REOPEN
4/10/2023Class C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING PUSH/PANIC BAR INSTALLED AT DOOR TO ROOF PREVENTING RE-ENTRY TO BUILDING FROM ROOF. AT PUBLIC HALL AT NORTH , 5th STORYVIOLATION CLOSED
4/10/2023Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B UPPER LEVEL, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION CLOSED
4/10/2023Class B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B UPPER LEVEL, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION WILL BE REINSPECTED
6/3/2022Class A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SPIRAL STAIRCASE ERECTED TO ROOF IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B LOWER LEVEL, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH · Apt 5BVIOLATION CLOSED