Bronx · March 2026
Best & worst months to sign a lease
Potential savings: ~10% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: REFIT DOOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN EVIDENCE OF MOSQUITOS IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT TG, 1st BSMT-APT FROM EAST AT SOUTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 28 total
ACRIS deeds and regulatory filings
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
UNSANITARY CONDITION — PESTS
UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
HEAT/HOT WATER — ENTIRE BUILDING